top of page

MONTREAL MUSEUM OF FINE ARTS BOURGIE HALL
Go multimedia actively participated on the scenographic, technological and acoustic aspects of the transformation of the Erskine and American Church, a heritage building and neighbor of the museum. The transformation of this former place of worship into a music broadcasting room obviously required significant and sensitive construction work. The main challenge in this room was to ensure that the integration of all the stage machinery and all the network infrastructure be as discreet as possible, so as not to alter while respecting the historic architecture of the space.
Bourgie room
bottom of page
